+91-8003009944, +91-9571767165
akshayinfraprojects5@gmail.com

Detail of Projects (Mr. N.K.Chaturvedi)


Project

Detail of Projects (Mr. G.S.Shekhawat)

S.No. Company Designation Name of Project Duration
1 G.N.Engineering Services Partner Self Employed 2018 to Till date
2 Sterling Indotech Consultants GM-Highways/ Project Coordinator Feasibility Study for Two Laning of various road of Pkg-11,16,19 and EWC(N) SHs, MDRs & others Road to be developed under VGF/ Annuity / EPC funded By ADB, World Bank and Malaysian Govt by PPP Div. of PWD Rajasthan.
Authority Engineer Services for Widening & Construction of 2 lane to 4-lane Parwanoo – Solan section from Km 67.000 to Km 106.139 of NH-22 now NH-05(New) in the state of Himachal Pradeh on EPC Mode Independent Engineer Servises for Construction of Shimla Bypass from Existing Km 129.050 to Km 156+130 Kaithli Ghat to Dhalli section of NH-22 Now NH-05(New) ) in the state of Himachal Pradeh on HAM Basis
2014 to 2018
3 M/s Abhyudaya Housing & Construction Company Pvt. Ltd. (EPC) Project Manager Two laning with paved shoulder of Bhopal-Sanchi section from Km 0.00 to Km 53.775of NH-86 Extn to be Executed as BOT( Annuity) Project on DBFO Pattern under NHDP Phase-III in the state of Madhya Pradesh. 2012 to 2014
4 M/s SNC-AARVEE JV Manger/AHE Independent Engineer for Six Laning of Gurgaon–Kotputli-Jaipur section of NH–8 from Km 42.700 to Km
273.000 (length 225.60 Km) in the state of Haryana / Rajasthan under NHDP Phase – V as BOT (TOLL) on DBFO pattern.
2009 to 2012
5 M/s Punj Lloyd Limited Dy. Manager Strengthening and Widening of Ratangarh to Kishangarh Section of State Highway( Mega Highway). (From Km
0.000 at Kishangarh to Km 207.000 at Ratangarh)
2006 to 2009
6 M/s Punj Lloyd Limited Sr. Engineer Construction of an access Controlled four lane divided Carriageway with six lane structures of Jaipur Bypass, Phase-II, Zone-‘D’, Jaipur( From Km 0.000 at Harmara on NH-11 to Km 34.720 at Chandwaji on NH-8) 2002 to 2006
7 M/s M.S. Consultants Asst. Engineer Construction of an access Controlled four lane divided Carriageway with six lane structures of Jaipur Bypass, Phase-II, Zone-‘D’, Jaipur( From Km 0.000 at Harmara on NH-11 to Km 34.720 at Chandwaji on NH-8) 2001 to 2002
8 M/s M.S. Consultants Site Engineer Maintenance and Rehabilitation of Service Roads along Zone-‘C’Jaipur Bypass connecting NH-11 At Km.246 to NH-8 at Km.273.500 (From Km 0.000 at Harmara to Km 13.760 at Heerapura) 2001 to 2002
9 M/s Satya Prakash Site Engineer Maintenance and Rehabilitation of Kotputli to Kishangarh Section of NH-8 (From Km.162.500 to Km.366.200) 2000 to 2001