Complete Project

Project

Employer- DLCS-Chaitanya.
Principal Employer-NHAI , New Delhi28 lakhsCompleted

 

Year Name of WorkValue Location Duration Client Value Status
2018 Construction of 01 no. Minor Bridge-6 x 10 m on Bhilwara-Chittorgarh section of 6 lane NH Project. Bhilwara 2 Month Employer-HG infra-IRB
Principal Employer-NHAI
20 Lakhs Completed
2018 Construction of VUP- 2 x 11 m on Chittorgarh-Udaipur section of 6 lane NH Project Chittorgarh 2 Months Employer- HG infra – Tata Projects
Principal Employer-NHAI
18 Lakhs Completed
2018 Demarcation & fixing of ROW Pillar using DGPS including junction detailing & preparation of Drawing from Km 78+800 to Km 150+000 section of Alwar distt. in the state of Rajasthan for Delhi-Vadodara Expressway Alwar 1 Months Employer- DLCS-Feedback Infra
Principal Employer-NHAI , New Delhi
11 Lakhs Completed
2018 Construction of 2nos LVUP 1×7.50m and Construction of Return wall, Approach Slabs, Crash Barrier etc. for other structures on Jaipur Ring Road Project of NHAI Jaipur 2 Months Employer-RKI – Gawar Construction Ltd.

 

Principal Employer- NHAI

18 Lakhs Completed
2018 Construction of Compound Wall which includes excavation, PCC, RRM. CRM, RCC , Water Proofing with Bitumen VG-10 . Providing & Fixing of Stone Coping and fencing using Concertina wire & Barbed Wire for HRRL Rajasthan Refinery of 6 Km at Pachpadra Site Barmer 8 Months Employer-Hari Om Builders , Ahmedabad

 

Principal Employer- HPCL & Govt. of Rajasthan (JV)

600 Lakhs Completed
2018 Construction of Compound Wall which includes excavation, PCC, RRM. CRM, RCC , Water Proofing with Bitumen VG-10 . Providing & Fixing of Stone Coping and fencing using Concertina wire & Barbed Wire for HRRL Rajasthan Refinery of 6 Km at Pachpadra Site Barmer 3 Months Employer-Satyam Construction Company , Mehsana.

 

Principal Employer- HPCL & Govt. of Rajasthan (JV)

215 Lakhs Ongoing
2018 Demarcation & fixing of ROW Pillar using DGPS including junction detailing & preparation of Drawing from Km 244+500 to Km 395+700 in Gujarat Section of Delhi-Vadodra Expressway Gujarat
2018 Preparation of Land Acquisition Plan as per Guideline of Ministry (PROW-100 m) & add additional Survey No. as per JMS with revenue team (Govt./ NHAI) and Preparation of additional 3A for interchanges, toll plaza, way side amenities/ rest areas in Sawai Madhopur, Tonk & Bundi distt. in the state of Rajasthan section of Delhi-Vadodra Expressway. Rajasthan 3 Months Employer- DLCS-Feddback Infra.

 

Principal Employer-NHAI , New Delhi

5.6 Lakhs Completed
2018 Traversing, Topography ,Fixing of GCP , TBM using DGPS, Auto level , Total Station and preparation of Survey Drawings for Widening of KHAMTARAI ROB L.C.No. 5 on UKURA-SARONA Bypass Rail line on Raipur-Bilaspur Road NH-30 in Raipur District in Chhattisgarh Chhattisgarh 7 Days Employer-M.A.Solutions Pvt.Ltd.

 

Principal Employer-Bansal Infrastructure Ltd

1.10 Lakhs Completed
2018 Traversing, Topography ,Fixing of GCP , TBM using DGPS, Auto level , Total Station and preparation of Survey Drawings for Construction of VUP at BALIKUDA,SIKHARPUR & BADACHANA BHUBANESHWAR-JAGATPUR-CHANDIKHOLE Section of NH-5 (New NH-16) On EPC Mode Orrisa 7 Days Employer-M.A.Solutions Pvt.Ltd.

 

Principal Employer-Bansal Infrastructure Ltd.

2.70 Completed
2018 Construction/ Up gradation of Two lane with paved shoulder of NH 70 from Munabao (NH 25E)- Sundara- Myajlar- Dhanana- Asutar-Ghotaru-Tanot [Design chainage Km 0.000 to 46.000 and Km 82.600 to Km 310.467] under phase-I of Bharatmala pariyojana (Total Length-273.867 km) on Hybrid Annuity Mode (HAM) in the state of Rajasthan Rajasthan Employer-D.R. Agrawal Infra Tech Pvt Ltd. 304 lakhs Ongoing
2019 OGL Survey for 90 KM and BC Top Level at Pindwara-Udaipur Site Rajasthan 6 Months Employer:-Tasu Consultancy 30 Lakhs Completed
2019 Consultancy Services for Preparation of DPR for Development of Economic Corridors , Inter Corridors & Feeder Routes to improve the efficiency of frieght movement in India under Bharatmala Pariyojna (Lot 4/Package-4) for Fixing of PROW Pillars at interchanges (Dausa District) Rajasthan 15 Days Employer:- Feedback Infra Pvt. Ltd 4.6 Lakhs Completed
2019 Widening & Strengthening of Existing Two Lane NH-76 and NH-86 from Kulpahar to Mahoba in the State of Uttar Pradesh Uttar Pradesh Employer:-Newway Structures Pvt. Ltd. 3.8 Lakhs Ongoing
2019 Topographic Survey and related activities for design consultancy at Gursarai-Garautha Water Supply Reorganisation Scheme survey, design , soil testing at Gursarai-Garautha town UP (Length: 135 KM) Uttar Pradesh Employer:- Cogent Training Research Development Consultants Pvt. Ltd. 4.2 Lakhs Ongoing
2019 Fixing of ROW boundary pillars at an interval of 50m from Meerut to Garh Mukteshwar NH-709A in the state of Uttar Pradesh by using DGPS (Length 38.2 KM) Uttar Pradesh 15 days Employer:- AutoRoutes Designers LLP 2.8 Lakhs Completed
2019 Construction/ Up gradation of  4 lane/2 lane Khajuwala-Poogal and Poogal–Dantour-Jaggasar-Gokul-Godu-Ranjeetpura-Charanwala–Naukh-Bap sections of NH-911 being built under Bharatmala on HAM basis (Total Length-212 km) in the state of Rajasthan, Structures awarded work (From KM 150 to 180) Rajasthan Employer:- Gawar Construction Ltd. 156 Lakhs Ongoing
2019 Construction of 6 lane access controlled green field highway from 120+000 to 148+000 of Raisisar-Deogarh section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor (EC) in Rajasthan on EPC under Bharatmala Pariyojna (Phase-I) (AJ/RD-Package-5) Osian-Jodhpur (Rajasthan Employer- NKC Projects Pvt. Ltd .

 

Principal Employer-National Highway of India

35 Lakhs Ongoing

Project

Detail of Projects (Mr. G.S.Shekhawat)

S.No. Company Designation Name of Project Duration
1 G.N.Engineering Services Partner Self Employed 2018 to Till date
2 Sterling Indotech Consultants Project Coordinator Design and Construction supervision Project in Uttrakhand disaster recovery Project (570 KM Road under DSC-4, 77 Bridges under BSC-01) having 14 offices in Uttrakhand.
And other Projects in Head Office
2015 to 2018
3 IL&FS
Transportations Network Ltd.
Project Manager Construction Development and Operation Maintenance of Four lane of Beawar-Gomti Section of NH-08 from KM 58.245 to KM 177.050 in the state of Rajasthan on DBFOT basis. Lane-4,., Length-118.805 KM, Project Cost-10800 Million 2013 to 2014
4 Louis Berger Group INC.USA FE/ARE 2009 to 2013 (Construction Supervision for Widening and Strengthening of Theog-Kotkhai-Rohru Road from Km 0+00 to Km 80+684 section of State Highway in the state Himachal Pradesh; funded by World Bank; Lane- 2; Length- 80.68Km; Cost- Rs. 2282.5 Million,), 2006 to 2009 (Construction Supervision of Rehabilitation and strengthening of Jabalpur- Amarkantak (SH-22) in MP Project Road No: 16 ADB Phase-II (Loan No 1959-IND) of 222Kms, Asian Development Bank Funded, ICB Contract Implemented with FIDIC contract conditions Project Cost: Rs. 1457.65 Million) 2006 to 2013
5 Punj Lloyd Ltd. Sr. Engineer/ DPM Widening and Strengthening of SH 24 Kishangarh – Ratangarh Section (224 Kms ) Two Laning under RIDCOR, BOT Project, Consultant :ScottWilson Kitpatric FIDIC conditions of Contract, Project Cost: Rs. 2220.9 Million 2005 to 2006
6 Zaidun Leeng SDN BHD – Artefact Projects JV Asst. Toll Specialist
/Manager
Operation and Maintenance of Four Laning and Strengthening of NH-2 from more than 200 km of Badarpur (Delhi) to Agra(UP) Section in Delhi Haryana Uttar Pradesh under FIDIC conditions of Contract, Lane – 4 ; Client: National Highways Authority of India, Contractor : Inter Toll ICS CECONS (JV) 2004 to 2006
7 IRCON/BRC/Punj Lloyd Site Engineer/ Site incharge Various Projects of NHAI, Noida to Greater Noida Expressway 1999 to 2004