Year | Name of Work | Location | Duration | Client | Status |
2024 | Civil Construction and associate works for COCO CNG station at Kalwar, Jaipur | Jaipur (Raj.) | 5 Months | Employer- Shrine Engineering/Torrent Power | Ongoing |
2023-24 | Provision of false ceiling in connection with “JP- Provision of new air-conditioning unit in place of old Overaged air conditioning system installed at PHOD Chamber of all floors & 4th, 5th and 6th floor of NWR HQ building at GTJT. | Jaipur (Raj.) | 9 Months | Employer- North Western Railway | Ongoing |
2022-24 | Dewatering of accumulated water, desilting of RWH and Hume Pipe, deployment of fix mud pumps with operator and other activity at LHS under Sr DEN/HQ/JP Jurisdiction. (For 2 Years). | Jaipur (Raj.) | 2 Years | Employer- North Western Railway | Ongoing |
2023 | Improvement and repair of Roof leakage, sanitary installation and drainage arrangement at DPA staff colony and repairs of valley gutter at Platform shed with down take pipe etc, repairs at kota stone flooring and miscellaneous improvement work at DPA | Jaipur (Raj.) | 8 Months | Employer- North Western Railway | Ongoing |
2022-23 | Provision of concertina coil fencing and boundary wall in the jurisdiction of ADEN(HQ-II) JP | Jaipur (Raj.) | 7 Months | Employer-North Western Railway | Completed |
2022-2023 | Routine Maintenance Works on Pachpadra to Ramji Ki Gol (PR-2) road in Rajasthan (Lot-2) | Rajasthan | 12 Months | Employer- RIDCOR Ltd | Completed |
2022 | Routine Maintenance Works on Hanumangarh-Ratangarh (HK-1) road in Rajasthan from Km 207 to Km 307 (Lot-3) | Rajasthan | 12 Months | Employer- RIDCOR Ltd | Completed |
2022 | Special repair to Boundary fencing, Entry and Exit Gate CISF Morcha and Control Room, Improvement to water supply and repair of road etc. at Rajiv Gandhi Bhawan, SAP, New Delhi for the year 2022-23 | Delhi | 8 Months | Employer-Airport Authority of India | Competed |
2021 | Construction of RCC retaining wall at 765/400 kV Khetri Sub-station under transmission system associated with LTA applications from Rajasthan, Part-C | Khetri, Rajasthan | 6 Months | Employer- S S Constructions Prinicipal Employer: Power Grid | Completed |
2021 | Construction of Toe Wall and Breast Wall on Baddi-Sai-Ramshaher road in Solan District (MDR-07) | Solan Himachal Pradesh | 3 Months | J.K.Associates | Completed |
2021 | Construction of Compound Wall and Civil Work for Daddumajara Landfill Site at Chandigarh Smart City , Chandigarh | Chandigarh | 8 Months | Varun Procon Pvt. Ltd | Completed |
2021 | Execution of Balance Civil works for Switch yard (PSS-1) and other misc. works” for AEML 700 MW Hybrid Project, at Village Sandhua, Fatehgarh, Rajasthan | Fatehgarh, Rajasthan | 3 Months | Employer- Adani Green Energy Six Ltd. | Completed |
2021 | Supply and Erection of Hard Barricading SS1 Section DFCC Project in Boisar and civil work | Boisar (Maharashtra) | 1 month | Employer- IRCON International Ltd. Undertaking ministry of Railway | Completed |
2020 | Construction of Civil work in balance left over works of 11 no. Bridges, Balance left over work Retaining wall and ground improvement work if any, from DFCC Km 112+000 (IR 79+300) to DFCC Km 123+000 (IR 90+300) in connection with construction of western dedicated freight corridor phase-II Vaitarana Sachin Section infra works package SS1B-I in the state of Maharashtra. | Palghar, Maharashtra | 7 Months | Employer-S S Constructions (IRCON International Ltd.) | Completed |
2020 | Construction of CC Road from Burhanpur to Inayi Mata Mandir (Maharashtra-MP Border) | Burhanpur, MP | 6 Months | S S Constructions | Completed |
2020 | Construction of 6 lane access controlled green field highway from 120+000 to 148+000 of Raisisar-Deogarh section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor (EC) in Rajasthan on EPC under Bharatmala Pariyojna (Phase-I) (AJ/RD-Package-5) | Osian-Jodhpur (Rajasthan) | 12 Months | Employer- NKC Projects Pvt. Ltd . Principal Employer-National Highway of India | Completed |
2019 | Construction of Boundary Wall, Security Cabin, RCC Vent of Basement at Pallacia-HI-End Residential Apartments at Plot No. A-2, Prithviraj Road near NCR building, Jaipur | Jaipur | 8 Months | Om Metals | Completed |
2019 | Repair and Maintenance work (Office Renovation) | Jaipur | 2 Months | Adecco India Pvt. Ltd. | Completed |
2019 | Construction/ Up gradation of 4 lane/2 lane Khajuwala-Poogal and Poogal–Dantour-Jaggasar-Gokul-Godu-Ranjeetpura-Charanwala–Naukh-Bap sections of NH-911 being built under Bharatmala on HAM basis (Total Length-212 km) in the state of Rajasthan, Structures awarded work (From KM 150 to 180) | Rajasthan | 6 Months | Employer:- Gawar Construction Ltd. | Completed |
2018 | Construction of Compound Wall which includes excavation, PCC, RRM. CRM, RCC , Water Proofing with Bitumen VG-10 . Providing & Fixing of Stone Coping and fencing using Concertina wire & Barbed Wire for HRRL Rajasthan Refinery of 6 Km at Pachpadra Site | Barmer | 3 Months | Employer-Satyam Construction Company , Mehsana. Principal Employer- HPCL & Govt. of Rajasthan (JV) | Completed |
2018 | Construction of VUP & LVUP including Return wall, Approach Slabs, Crash Barrier etc. for other structures on Jaipur Ring Road Project of NHAI | Jaipur | 6 Months | Employer-RKI – Gawar Construction Ltd. Principal Employer- NHAI | Completed |